Site Plan Drawings: Contents, Scale and Approval Requirements

What a site plan drawing must show, the scales and colour codes approval authorities expect, how to draw one, and what Bengaluru's city corporations ask for at plan sanction.

On this page
  1. What Is a Site Plan Drawing and Why Is It Needed?
  2. What Does a Site Plan Drawing Show?
  3. What Scale Should a Site Plan Use?
  4. Site Plan vs Floor Plan: What Is the Difference?
  5. How Do You Draw a Site Plan Step by Step?
  6. What Do BBMP and GBA Require for a Site Plan Drawing in Bengaluru?
  7. What Mistakes Get a Site Plan Drawing Rejected?
  8. Which Site Plan Software and Tools Can You Use?
  9. How Do You Keep a Site Plan Up to Date?
Summary — what you need to know
  • A site plan drawing is a top view of the entire plot, not the rooms inside the house.
  • It shows boundaries, north direction, road widths, setbacks, ground type and features like wells, drains and trees.
  • Bengaluru bye-laws ask for 1:500 on sites up to 1 hectare and a key plan at 1 in 10,000 or larger.
  • In Bengaluru, plans now go to your city corporation, with an e-khata and a registered architect's signature.

A site plan drawing is a scaled, top-down drawing of a plot that shows its boundaries, the building footprint, setbacks, access roads and services. Planning authorities use it to check that a proposed building fits the plot and the rules.

1:500
Site plan scale for plots up to 1 hectare
1:10,000
Smallest scale allowed for the key plan
5%
Slope above which block levels must be shown

What Is a Site Plan Drawing and Why Is It Needed?

A site plan drawing is the plan of the whole property seen from above, drawn to scale. It places the building inside the plot and shows what surrounds it.

The authority uses it to check setbacks and access, the contractor uses it to mark out the footprint, and banks and buyers refer back to the sanctioned copy.

Labelled site plan of a 30 x 40 ft Bengaluru plot showing plot dimensions, north arrow, road and storm drain, building footprint with front, rear and side setbacks, gate, parking, sump, rainwater pit, tree and a title block
Site plan, key plan, layout plan

A key plan locates the plot in the neighbourhood. A layout plan shows a whole subdivision. A site plan covers one plot and its building.

What Does a Site Plan Drawing Show?

A site plan drawing shows the plot boundary, north direction, adjoining roads and plots, the building footprint with setbacks, and the ground and physical features. Bye-law 3.2 of the Bangalore Mahanagara Palike Building Bye-laws 2003 lists these items for every building licence application.

  • Title block: property number, street or block name, site number and layout approval reference, and the building's use.
  • Boundaries of the site and of any adjoining land the owner also holds.
  • North direction relative to the building.
  • Adjacent roads, streets or lanes, with their names and widths.
  • Neighbouring plots, marked as vacant or built-up.
  • Building footprint and setbacks left for light and ventilation.
  • Nature of the ground: rocky, gravelly, clayey, sandy or made-up (filled) ground.
  • Block levels where the slope exceeds 5% (1:20) or a basement is proposed.
  • Physical features such as wells, drains and transmission lines.
  • Natural features such as existing trees, ridges and valleys.

Architects also add drainage, water lines, rainwater pits and parking. A contour survey gives the levels you need for sloping plots.

What Scale Should a Site Plan Use?

A site plan drawing for a plot up to 1 hectare uses a scale of 1:500, and larger sites use 1:1000. At 1:500, 1 cm on paper equals 5 m on the ground, so a 12 m × 18 m (about 40 × 60 ft) plot fits in a 2.4 cm × 3.6 cm box.

That small size is why many architects draw house site plans at 1:200 or 1:100 for clarity. Check with your sanctioning office that the scale is accepted.

Drawing scales for a building plan application

Bangalore Building Bye-laws 2003, bye-law 3.2
DrawingScaleWhat it shows
Key plan1 in 10,000 or largerPlot location against nearby landmarks
Site plan, up to 1 ha Most homes1:500Plot, footprint, setbacks, roads, services
Site plan, over 1 ha1:1000Same items on a larger site
Building plan1:100 or largerFloor plans, sections and elevations
The National Building Code of India 2016, Part 2, sets the national model; state and city bye-laws decide the final rules.

What do the colours on a site plan mean?

Approval drawings follow a fixed colour code so officers can read them quickly. The Bangalore bye-laws also ask for prints folded to A4 size.

Site plan colour code

Bye-law 3.5, Table 2
ItemHow it is shown
Plot linesThick black
Existing streetGreen
Future streetGreen dotted
Permissible building lineThick dotted
Open spaceNo colour
Work to be demolishedYellow hatched
Proposed work Key itemRed filled
Drainage and sewerageRed dotted
Water supplyThin black dotted

Site Plan vs Floor Plan: What Is the Difference?

A site plan shows the plot and everything outside the building, while a floor plan shows the rooms inside one floor. You need both for a building plan approval.

Site plan

Outside the walls

Points

  • Covers the whole plot and its surroundings
  • Usual scale 1:500, sometimes 1:200
  • Shows boundaries, setbacks, roads and north
  • Used to check coverage and access rules

Floor plan

Inside the walls

Points

  • Covers one floor of the building
  • Usual scale 1:100 or 1:50
  • Shows rooms, walls, doors and windows
  • Used to check room sizes and layout

For room-by-room layouts, see our guide to house map design and floor plan layouts.

How Do You Draw a Site Plan Step by Step?

You draw a site plan by collecting the plot's legal and survey data, setting a scale, drawing the boundary, then adding the building, setbacks, roads and services. A simple site plan drawing for a house follows these steps:

  1. Gather documents. Collect the sale deed, khata, survey sketch and any layout approval for the plot.
  2. Measure the plot. A licensed land surveyor records boundary lengths, angles and levels.
  3. Find the rules and set a scale. Note setbacks and floor area ratio (FAR) for your road width, then set up the drawing at 1:500, 1:200 or 1:100.
  4. Draw the boundary, north arrow and roads. Then place the footprint and dimension every setback from the plot line.
  5. Add features and services. Mark wells, trees, drains, water lines, parking and rainwater pits.
  6. Apply the colour code and title block. Then have the architect or engineer check and sign it.

What Do BBMP and GBA Require for a Site Plan Drawing in Bengaluru?

Bengaluru site plans for building approval still follow the BBMP framework, but the sanctioning office is now your city corporation. The Greater Bengaluru Authority (GBA) replaced the Bruhat Bengaluru Mahanagara Palike (BBMP) with five corporations, Central, North, South, East and West, from 2 September 2025.

A site plan application needs:

  • Bye-law contents: the 2003 bye-law items, 1:500 scale and colour code.
  • Signatures: the owner or an authorised agent, and a registered architect, engineer or supervisor with their registration number.
  • E-khata: the GBA has made an e-khata compulsory for building plan applications.
  • Layout reference: if the plot sits in an approved layout, such as a Bangalore Development Authority (BDA) layout, the title block must quote that approval.

What is Nambike Nakshe?

Nambike Nakshe is Bengaluru's trust-based online plan approval scheme for sites up to 4,000 sq ft (50 × 80 ft). It began in September 2024: an authorised architect or engineer certifies the plan and uploads it for approval.

Version 2.0, launched in September 2026, checks the uploaded plan against the rules automatically. Compliant plans for up to four dwelling units can be approved in about 30 minutes, using the plot's khata number and EPID (e-property ID).

Rules are still changing

Portals and procedures are still moving from BBMP to the corporations. Confirm the current checklist with your corporation's town planning office.

After sanction, you still need a commencement certificate before work starts on site.

60-minute delivery

Plan sanctioned? Start building

Foundation and structure materials delivered across Bengaluru.

CementTMT SteelBricks & BlocksHardware
Shop nowGet a price listBengaluru · open 8 am–8 pm, all days

What Mistakes Get a Site Plan Drawing Rejected?

A site plan drawing gets returned when it uses the wrong scale, misses a bye-law item or shows setbacks that break the rules. Check for these before you submit:

  • Wrong or missing scale: no scale bar, or dimensions that do not match the stated scale.
  • No north arrow or road width: officers cannot check setbacks or road-based limits without them.
  • Setbacks drawn from the wrong line: measured from a compound wall instead of the plot boundary.
  • Plot size mismatch: drawing area differs from the khata or sale deed.

Which Site Plan Software and Tools Can You Use?

CAD software such as AutoCAD is the standard tool for site plan drawings that go to approval. Free tools suit sketches and planning.

Site plan drawing software and resources

Availability in India
ToolTypeBest for
AutoCAD Approval setsPaid CAD, DWG filesScaled, layered submission drawings
QGISFree, open-source GISMapping survey data and larger land parcels
Canva Not for approvalFree online design toolSimple presentation site plans
Dishaank appKarnataka government map appChecking survey number location and Bhoomi land records
Dishaank uses geo-referenced village maps and is not valid as legal proof in land disputes.

CAD (computer-aided design) is for precise drafting; GIS (geographic information system) is for mapping land data.

How Do You Keep a Site Plan Up to Date?

You keep a site plan up to date by recording every construction change against the sanctioned drawing.

Keep the signed plan on site, mark changes such as a moved sump on an as-built copy, and get revised approval before reducing any setback.

Watch out

The building is inspected against the sanctioned plan before you get an occupancy certificate. Deviations beyond the allowed limit can delay the certificate or need regularisation.

Frequently Asked Questions

How do I draw a site plan?

Survey the plot, then draw the boundary to scale with a north arrow and adjoining roads. Add the footprint, setbacks and services, apply the colour code and have a registered architect sign it.

What is site plan drawing?

A site plan drawing is a scaled top view of a whole plot. It shows the boundaries, building position, setbacks, surrounding roads and features such as wells and trees.

What is a site plan and what does it include?

A site plan is the drawing that places a building on its plot. Under the Bangalore Building Bye-laws 2003 it includes a title block, plot boundaries, north direction, adjoining roads and plots, the building area and setbacks, the nature of the ground, and physical and natural features.

What features should I consider when drawing a site plan?

Consider plot slope, road width, setbacks, existing trees and wells, drainage direction and overhead power lines. Also leave space for parking and rainwater harvesting pits.

What are the steps to draw a site plan?

Collect documents, survey the plot, note the setback and FAR rules and pick a scale. Draw the boundary, roads and building, add services, then get it signed.

Do I need a licensed professional to approve my site plan?

Yes, for a building plan application. In Bengaluru the plans must be signed by a registered architect, engineer or supervisor, whose registration number appears on the drawing. The final approval comes from the sanctioning authority, now your city corporation.

What tools are available for creating site plans?

AutoCAD and other CAD programs are used for approval drawings. QGIS maps survey data, Canva suits simple presentation plans, and Karnataka's Dishaank app locates survey numbers.

What information should I gather before starting a site plan?

Gather the sale deed, khata or e-khata, survey sketch, any layout approval, and a fresh measurement of the plot with levels. Also find the road width in front of the plot and the setback and FAR rules that apply to it.