



Dr. Fixit 112 Pidifin 2K Waterproof Coating
- Manufacturer: Dr. Fixit (Pidilite)
- Product: Pidifin 2K Waterproof Coating
- Article Code: 112
- Type: Two-component (2K) waterproof coating
- Drying Between Coats: At least 1 to 2 hours, second coat applied perpendicular
- Initial Curing: At least 12 to 24 hours after the second coat
- Before Filling a Tank: At least 7 days of proper curing
- Pack Sizes: 3 kg, 15 kg
- Application Areas: Roofs, terraces, bathrooms and other wet areas
Dr. Fixit Pidifin 2K (112) is a two-component waterproof coating from Dr. Fixit (Pidilite) for waterproofing roofs, terraces and wet areas, in 3 kg and 15 kg packs. The two parts are mixed just before use, and the chemical reaction between them gives a tougher, more durable waterproof barrier than a single-component coating. Allow at least 1 to 2 hours before the second coat, let the system cure for at least 12 to 24 hours, and wait at least 7 days before filling a tank or doing a ponding test.
Key Features
- Two-Component System: The mixed reaction gives superior water resistance and durability
- Roofs, Terraces and Wet Areas: Professional-grade waterproofing for residential and commercial work
- Defined Timings: Clear gaps for recoating, curing and tank filling
Technical Specifications
| Specification | Details |
|---|---|
| Manufacturer | Dr. Fixit (Pidilite) |
| Product | Pidifin 2K Waterproof Coating |
| Article Code | 112 |
| Type | Two-component (2K) waterproof coating |
| Pack Sizes | 3 kg, 15 kg |
| Application | Roofs, terraces, bathrooms and other wet areas |
| Coats | Second coat applied perpendicular to the first |
| Drying Between Coats | At least 1 to 2 hours before the second coat |
| Initial Curing | At least 12 to 24 hours after the second coat |
| Before Filling a Tank or Ponding Test | At least 7 days of proper curing |
Recommended Applications
- Roofs and Terraces: Superior protection against water seepage
- Bathrooms: Floors and walls, before tiling
- Wet Areas: Suitable for wet area waterproofing in general
- Premium Projects: Professional-grade, long-lasting waterproofing for high-end work
Application Guidelines
- Prepare: Clean the surface thoroughly and remove loose material and dust
- Mix: Combine both components in the exact ratio given on the pack, and use the mix within its pot life
- First Coat: Apply by brush or roller
- Wait 1 to 2 Hours: Let the first coat dry for at least this long
- Second Coat: Apply the second coat perpendicular to the first
- Cure: Allow at least 12 to 24 hours of curing after the second coat for full performance
- Tanks and Ponding Tests: Never fill the structure with water after only 3–5 days — wait at least 7 days of proper curing
Why Buy from HomeRun?
- Authentic Dr. Fixit Product: Verified genuine product sourced from authorized Dr. Fixit channels
- 60-Minute Bangalore Delivery: Express delivery to active service zones – ideal for active waterproofing and renovation projects
- Project-Friendly Availability: Single-unit ordering in 3 kg and 15 kg packs for terrace-by-terrace and bathroom-by-bathroom procurement on residential and commercial waterproofing jobs
1) What is a two-component (2K) waterproof coating?
It has two parts that you mix just before application. The chemical reaction between them creates a tougher waterproof barrier with better durability than a single-component coating.
2) Can I use Pidifin 2K for roof waterproofing?
Yes. The two-component system gives superior protection against water seepage, which suits roofs and terraces.
3) How do I mix it, and how long can I use the mix?
Mix both components in the exact ratio specified on the pack, and use the mix within the pot life given in the instructions. Proper mixing is critical to waterproofing performance, so mix only as much as you can apply in that time.
4) Can I use it for bathroom waterproofing?
Yes. Apply it on bathroom floors and walls before tiling for superior waterproofing protection.
5) How many coats, and how long between them?
Typically 2 to 3 coats are recommended. Let each coat dry for at least 1 to 2 hours before the next, and apply the second coat perpendicular to the first. After the second coat, allow at least 12 to 24 hours of curing.
6) When can I fill a tank or do a ponding test?
Wait at least 7 days of proper curing before filling a water tank or swimming pool, or running a ponding test. Never fill the structure after only 3 to 5 days.
- Return within 24 hours of delivery for:
- Damaged or defective product
- Wrong or missing item
- Product cannot be returned once opened or used
- Refer to Refund Policy for complete details
You may also like






